News

Splashpad still taking shape

Even though the concrete is still curing, work at the splashpad is still going on. The electrical work for the pad is done, but there still needs to be some work done at the poolhouse to make the connection there.
Town Manager Mike Faith said a water softener needs to be hooked up as well and a new water line to the pad. He said there could possibly be a new sewer line installed so…